Oceania Diary Project

Oceania Diary Project

Client: Babbage Consultants
Location: Glenavy, Oamaru
Start Date: 2013
Completion Date: 2014

This project consists of numerous concrete and timber structures of diverse design, all of which contribute towards the Oceania Glenavy diary project infrastructure under the project management team at Babbage Consultants.

The project was agreed at short notice and we were able to establish an excellent team, working out of town, without problems in order to meet the client's needs as required.

Alongside a brilliant long established construction team we were also able to provide a 100 T crane, numerous scissor hoists, 25 T Kato crane, Merlo forklift, site containers, numerous trucks and other plant in order to facilitate the high programme requirements of the project and construction methods.

The provision of an extensive plant fleet and highly experienced operators were pivotal to the success of the project.

Back to Portfolio
Share by: